Configure supply valuation pool¶
Configuring a supply valuation pool involves accessing the configuration screen, creating categories for better organization, and managing key details such as valuation definitions and pipeline points.
Prerequisites¶
- You must have the permissions to add or update the Supply valuation pool screen.
Process steps¶
Step 1: Navigate to Internal supply valuation pool screen¶
- Log in to the nGenue application.
- Click on the Search icon and type Supply valuation pool in the search bar.
- Double-click Supply valuation pool in the search results to open the Supply valuation pool screen.
- The next screen has two main sections: Valuation pool selection and Valuation pool configuration.
- Valuation pool selection: Displays a list of existing valuation pools.
-
Valuation pool configuration: Shows the details of the selected pool, allowing you to add, update, or edit configurations. The table below describes the available icons and their functions:
Icons Description Add a new record Edit the record detail. Save the record. Cancel the updates being made to the record. Delete a record.
Step 2: Configure a valuation pool¶
- Open the Valuation pool configuration screen and click on the Add button.
-
Enter the following details under the Valuation pool definition tab:
Fields Description Data type Mandatory (Y/N) Fetched from (UI screen) Displayed on (UI screen) Val pool Id An auto-generated identifier assigned when the valuation pool configuration is saved. Auto-generated Y Auto-generated N/A Valuation pool name A user-defined name to describe the valuation pool. String Y User input Pipeline location Description Optional field for providing additional context or details about the valuation pool. String N User input N/A Commodity The specific commodity associated with the valuation pool, selected from a predefined dropdown list. Dropdown Y Commodities screen N/A Market index/curve A dropdown list allowing selection of the applicable market index or curve for valuation. Dropdown Y Index curve definition screen MTM screen Effective date The date when the valuation pool becomes active. Date Y User input N/A End date The expiration date for the valuation pool; can be left blank if the pool is to remain active indefinitely. Date N User input N/A
Step 3: Configure pipeline points¶
- Go to the Pipeline points tab and click on the Assign points to button.
- Enable the Pipeline checkbox and select the pipeline from the dropdown.
- Click Load location to display the available locations.
- Add locations by:
- Click on the forward arrow (>>) key to include all locations.
- Click on the forward arrow (>) key to include selected locations.
- Remove locations using the backward arrows (<< or <) if necessary.
- Click Accept to save your changes.
- The system will display the assigned valuation pool under the Valuation pool section on the Location screen.